摘要
绍了山岭重丘区高速公路交通工程及沿线设施施工和主体工程项目及其内部各项目施工时应当协调的一些情况,说明了合理施工组织的重要性.
This paper introduces some situation must be collaborated during the execution between traffic engineering and principal parts of the expressway on moutainous terrain, and emphasizes the importance of reasonable execution design.
出处
《福州大学学报(自然科学版)》
CAS
CSCD
2000年第z1期91-95,共5页
Journal of Fuzhou University(Natural Science Edition)
关键词
高速公路
交通工程设施
施工组织
expressway
traffic engineering and facility
execution design