地铁浅埋暗挖法穿越既有桥梁施工变形控制 被引量:24

Deformation Control of Crossing Over Existing Bridge by Shallow Tunneling
下载PDF
导出
摘要 地铁浅埋暗挖法穿越既有桥梁施工时,会对邻近桥梁桩基产生不利影响,使得既有桥梁产生较大的安全使用风险.因此在穿越施工时,应当采取必要的技术措施对这种不利变形进行控制,以保证既有桥梁结构安全.以北京地铁5号线18标区间隧道浅埋暗挖法穿越雍和宫桥施工为例,给出隧道施工穿越既有桥梁的变形控制方案.首先,在施工前通过数值模拟并结合工程经验,确定桥桩变形的阶段及总体控制标准,为施工过程控制提供参照指标;其次,穿越前在桥区类似地层中设置监测主断面进行监测试验,得到桥区地层变形基本规律,同时进行注浆试验,确定出适宜的注浆材料及注浆参数,为优化施工方案提供依据;最后,在施工中依据工前确立的阶段控制标准,通过对各主要施工步序进行动态控制,来实现总体的控制目标.监测结果表明:桥梁实际差异沉降量仅为控制值的58.4%,达到了控制要求,保证了既有桥梁的安全.该控制方案的成功应用,可为类似工程提供重要的借鉴及指导. When shallow tunnels crosses through existing bridges,there will be unfavourable influence on adjacent bridge pile,and even more serious safety risk for exsiting bridges during operating.So,to control this unfavored deformation,necessary techniques must be adopted in order to keep the existing bridge safe during construction.In this paper,by taking Yong He Gong station to He Ping Li North Street station interval of line 5 in Beijing for example,deformation control method of crossing over existing bridge by shallow tunneling is presented.Firstly,combinating numerical modelling with project experiences before tunneling,the stage and total control criterion of bridge pile deformation are detemained.Secondly,according to monitoring test of main monitoring section in bridge areas,soil deformation rule in this area are obtained. At the same time,grouting test is adopted to determine suitable grouting material and parameters which supply evidence for optimizing methods.Finally,based on the stage control criterions,dynamic control is adopted for main construction steps to realize total control target during tunnelling.The measured data shows that actual differential settlement of bridge is up to 58.4%of control standard,meets the control requirement and makes existing bridge safe.Successful application of this control method can provide important reference for similar projects.
出处 《北京工业大学学报》 EI CAS CSCD 北大核心 2009年第5期611-620,共10页 Journal of Beijing University of Technology
基金 北京市科技计划重点资助项目(D08050603130804) 国家高技术研究发展计划“863”资助项目(2006AA11Z119).
关键词 浅埋暗挖法 既有桥梁 变形控制 注浆试验 监测试验 shallow tunneling existing bridge deformation control grouting test monitoring test
  • 相关文献

参考文献3

  • 1[1]孙宗军.盾构施工与桩基础相互作用的三维力学分析与研究[D].南京:东南大学土木工程学院,2004.SUN Zong-jun.Three dimensional mechanical analysis and research of interaction between shield tunnel construction and pile foundation[D].Nanjing:School of Civil Engineering,Southeast University,2004.(in chinese)SUN Zong-jun.Three dimensional mechanical analysis and research of interaction between shield tunnel construction and pile foundation[D].Nanjing:School of Civil Engineering,Southeast University,2004.(in chinese)
  • 2[2]何海健.地铁洞桩法施工对邻近桥桩的影响及控制[D].北京:北京交通大学土木建筑工程学院,2007.HE Hai-jian.Influence and control of metro tunneling by drift-PBA method on adjacent bridge piles[D].Beijing:School of Civil Engineering,Beijing jiaotong University,2007.(in Chinese)HE Hai-jian.Influence and control of metro tunneling by drift-PBA method on adjacent bridge piles[D].Beijing:School of Civil Engineering,Beijing jiaotong University,2007.(in Chinese)
  • 3[5]CHENG C Y,DASARI G R,CHOW Y K,et al.Finite element analysis of tunnel-soil-pile interaction using displacement controUed model[J].Tunnelling and Underground Spaee Technology,2007,22(4):450-466.