地铁盾构隧道穿越瓦斯地层的施工技术 被引量:19

Construction Technology on Metro Shield Tunnel through Gas Stratum
下载PDF
导出
摘要 介绍了武汉轨道交通2号线一期工程汉口站至范湖站区间盾构隧道成功穿越低瓦斯地层的地质及施工情况。就目前的技术水平和存在的不足,提出了瓦斯地层勘察的基本要求。分析了瓦斯地层修建隧道的风险因素和风险源。针对性地提出了瓦斯地层隧道的电气设备防爆改造、监控监测系统、隧道通风系统、盾构掘进参数、施工工艺、人员培训等方面的技术措施、方案和技术参数。 This paper elaborates the geological and construction conditions between Hankou Station and Fanhu Station of Wuhan Rail Transit Line 2,especially the successful shield tunneling through low gas stratum between them.It explains the gas formation,composition and distribution and expounds the basic exploration requirements of the gas stratum according the current technology level and the deficiency.Then this paper analyzes the risk factors and risk sources of gas tunnel,discusses the explosion-proof electric accessories installed in gas tunnel,monitor system,tunnel ventilation system,shield parameters,construction techniques,personnel training programs and the related technical parameters,for the similar projects in the future to learn and refer to.
出处 《城市轨道交通研究》 北大核心 2009年第8期68-74,共7页 Urban Mass Transit
关键词 地铁 盾构隧道 瓦斯地层 施工技术 metro shield tunnel gas stratum construction technology
  • 相关文献

参考文献5

二级参考文献18

共引文献71

同被引文献145

引证文献19

二级引证文献73

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部