摘要
重庆彭水水电站大坝高程191.6至高程199.5结构复杂,包括交通廊道、上游基础灌浆廊道、下游排水廊道、集水井和水泵房、下游弧形坡面等。着重叙述大坝在该高程施工时的各种施工手段和入仓方法。
The dam elevations of Pengshui water power station of Chongqing are from 191.6 to 199.5,the structure is complex,which includes transportation corridor,upstream foundation grouting corridor,downstream drainage corridor,sump and water pump house,downstream arc slope etc.This paper mainly expounds the all kinds of construction method and entering storehouse method on these elevations construction.
出处
《吉林水利》
2007年第12期46-48,共3页
Jilin Water Resources
关键词
彭水水电站
大坝施工
廊道群
施工组织
碾压混凝土
施工技术入仓
Pengshui water power station
dam construction
corridor network
construction organization
roll and compress concrete
construction technology
entering storehouse