期刊文献+

碾压混凝土坝温控防裂措施研究 被引量:1

The research for the measure of temperature control against cracks in roll compress concrete dam
下载PDF
导出
摘要 虽然高粉煤灰掺量使得碾压混凝土水化热较低,但由于采用通仓连续碾压的施工方式,使得碾压混凝土高坝的温度裂缝问题依然十分突出。本文通过分析碾压混凝土温控防裂的特点和裂缝的分类及原因,针对性的研究总结了温控防裂的措施,为碾压混凝土坝的设计施工和防裂提供参考。 In the recent years,roll compress concrete dams are developed rapidly.The RCC which contains higher ratio of fly ash makes heat occurred by water and cement mix lower,but the construction of continuing roll compress make the temperature cracks always happened in the higher RCC dam.Through analysis of the feature of temperature control against cracks in roll compress concrete,of the sort and cause,this paper researches and summarizes the temperature control crack prevention measures,which provides the reference for the design and construction of RCC dam.
出处 《吉林水利》 2007年第9期3-6,共4页 Jilin Water Resources
关键词 碾压混凝土 温度控制 防止裂缝 特点 措施 roll compress concrete(RCC) temperature control crack prevention features measure
  • 相关文献

参考文献4

二级参考文献6

共引文献27

同被引文献6

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部