期刊文献+

水厂高藻期污泥量的确定与调节 被引量:3

Determination and adjustment of water plant's sludge quantity in high algae period
下载PDF
导出
摘要 依据沉淀池和排水池的排泥规律确定了日排泥水总量,采用物料平衡法、排泥现场测定法、排泥水处理系统参数监测法及公式法确定日总干污泥量。结果表明:排泥水处理系统监测法操作容易、设备简单且数据可靠。通过污泥量的确定,可调节排泥规律和排泥水处理系统的流量及浓度,并可降低排泥水对系统的冲击负荷,使水厂在高温高藻期达到稳定运行。 Total daily sludge water discharge amount can be calculated based on desludging frequencies of sedimentation tank and drainage tank,the total dry sludge was defined from mass balance,on-site measurement of sludge discharge,monitoring of parameters in sludge water treatment system,and relevant formula.The results show that monitoring of parameters in sludge water treatment system is a method with easy operation,simple facilities and reliable data.Determination of amount of sludge will enable to adjust sludge discharge procedures,flow rate and sludge concentration,therefore minimize the negative impact of desludging and achieve stable operation when raw water is in high temperature and contains high algae concentration.
出处 《供水技术》 2008年第1期47-49,共3页 Water Technology
关键词 水厂 高温高藻 排泥水 污泥量 water plant high temperature and algae sludge water amount of sludge
  • 相关文献

参考文献3

二级参考文献2

  • 1小休默尼克 M J 李春华(译).水和废水处理物理化学工艺流程计算[M].北京:中国建筑工业出版社,1992..
  • 2日本水道协会 伊承勋(译).净水厂排水处理设备设计[M].北京:中国建筑工业出版社,1995..

共引文献20

同被引文献31

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部