Theory and practice of construction simulation for high rockfill dam 被引量:10

Theory and practice of construction simulation for high rockfill dam
原文传递
导出
摘要 Construction simulation for high rockfill dam (CSHRD) is the technology that takes advantage of computer simulation to observe and analyze a complex construction process, which is useful for construction design and management. In this paper, the domestic and oversea research status of CSHRD is reviewed firstly, along with introduction of their present achievements and deficiencies, and the CSHRD theory is also described. Then, considering the influence of many stochastic factors, integrated simulation for high rockfill dam construction (HRDC) is presented with technologies of cycle operation network (CYCLONE) and computer simulation. It rationally combines two subsystems in HRDC, namely haulage and placement of rockfill subsystem, which reflects the actual construction objectively. Important parameters, such as the haulage intensity and traffic density, are obtained, and the process of CSHRD is represented intuitively in dynamic visualization. All of these help engineers to make rapid decisions in HRDC scientifically. Construction simulation for high rockfill dam (CSHRD) is the technology that takes advantage of computer simulation to observe and analyze a complex construction process, which is useful for construction design and management. In this paper, the domestic and oversea research status of CSHRD is reviewed firstly, along with introduction of their present achievements and deficiencies, and the CSHRD theory is also described. Then, considering the influence of many stochastic factors, integrated simulation for high rockfill dam construction (HRDC) is presented with technologies of cycle operation network (CYCLONE) and computer simulation. It rationally combines two subsystems in HRDC, namely haulage and placement of rockfill subsystem, which reflects the actual construction objectively. Important parameters, such as the haulage intensity and traffic density, are obtained, and the process of CSHRD is represented intuitively in dynamic visualization. All of these help engineers to make rapid decisions in HRDC scientifically.
出处 《Science China(Technological Sciences)》 SCIE EI CAS 2007年第z1期51-61,共11页 中国科学(技术科学英文版)
基金 Supported by the National Natural Science Foundation of China for Distinguished Young Scholars (Grant No. 50525927) the National Basic Research Program of China (973 Program) (Grant No. 2007CB714101)
关键词 HIGH ROCKFILL DAM construction simulation CYCLE operation NETWORK VISUALIZATION high rockfill dam, construction simulation, cycle operation network, visualization
  • 相关文献

参考文献3

二级参考文献13

  • 1郑家祥,殷奎生.高土石坝施工过程计算机模拟[J].水电站设计,1993,9(2):70-75. 被引量:6
  • 2钟登华,孙锡衡.循环网络模拟技术[J].系统工程理论与实践,1994,14(2):7-12. 被引量:22
  • 3《运筹学》教材编写组.《运筹学》修订版[M].北京:清华大学出版社,1998..
  • 4Kruglinski D J Wingo S.Visual C++6.0技术内幕[M].北京:希望电子出版社,2001..
  • 5Halpin, D.W., CYCLONE-A method for modeling job site processes[J]. Constr. Div., ASCE, 1977, 103(3): 489-499.
  • 6Fritsch D.Three-dimensional geographic information system: Status and prospects [A]. International Archives of Photogrammetry and Remote Sensing, Vienna: the Committee of the 18th ISPRS [C].1996, 18(3): 215-221
  • 7Govindan Kannan, Julio C Martinez. A Framework for incorporating dynamic strategies in earth- moving simulations [ A ]. Proceedings of the 1997 Winter Simulation Conference [ C ]. 1997,1 119-1 126.
  • 8DW Halpin. CYCLONE - A method for modeling job site processes[J]. J. Constr. Div., ASCE. 1977, 103 (3): 489-499.
  • 9孙锡衡 钟登华.循环网络技术[J].中国水利学会施工委员会系统工程学组,1988,(6):7-12.
  • 10孙锡衡 齐东海.水利水电工程施工计算机仿真与程序设计[M].北京:中国水利水电出版社,1997..