3[3]Shyh Jier Huang.Short-Term Load Forecasting Via ARMA Model Identification Including Non-Gaussian Process Considerations[J].IEEE Transactions on Power Systems,2003,18(2):673-679.
5[5]Al-Hamadi H M,Soliman S A.Shortterm electric load forecasting based on Kalinan filtering algorithm with moving windows weather and load model[J].Electric Power Systems Research,2004,(68):47-59.
6[6]Jwo,W.-S.Liu,C.W.Liu,C.-C.Hsiao.Hybrid expert system and simulated annealing approach to optimal reactive.power planning[J]IEE Proceedings,Generation,Transmission and Distribution,1995,142(4):381-385.