摘要
简述普宁市乌石拦河闸状况,简析拦河闸消能工除险加固设计方案,根据理论和水工试验分析消能工除险加固设计方面的问题。
This paper presents the situation of Wushi's river gate of Puning City and the reinforcement design plan for energy dissipaters of river gate.It also analyses the design problem concerning the reinforcement of energy dissipaters on the basis of theory and hydraulic experiment.
出处
《广东水利电力职业技术学院学报》
2007年第2期69-71,共3页
Journal of Guangdong Polytechnic of Water Resources and Electric Engineering
关键词
拦河闸
除险加固
消能工
水工模型试验
设计分析
river gate
reinforcement
energy dissipaters
hydraulic model test
design and analysis