摘要
分析了丰泰公司200MW机组集散控制系统现状,阐述了WDPF系统移植方案,为电厂集散控制系统的改造升级提供了建议。
Analyzed the FENGTAI company 200 MW machine set to gather to spread the control system present condition,elaborate the WDPF system to transplant a project,got stripe to provide a suggestion for the reformation that the power station gathers to spread control system.
出处
《内蒙古煤炭经济》
2006年第4期8-9,共2页
Inner Mongolia Coal Economy
关键词
集散控制系统
移植
Gather to spread the control system
Transplant