期刊文献+

乌江构皮滩水电站烂泥沟人工砂石加工系统设计探讨

Discussion About the Lan Ni Gou's Artificial Sand and Stone Processing System Design of Wujiang Gou Pi Tan Hydropower Station
下载PDF
导出
摘要 乌江构皮滩水电站是贵州省境内总装机容量最大的水电站,右岸烂泥沟人工砂石加工系统又是国内正在建设和运行的大型人工砂石加工系统之一。对此阐述该系统的设计情况,从而为水电工作者遇到类似问题提供借鉴和参考。 Wujiang Gou Pi Tan Hydropower Station is one hydropower station with the largest installation capacity in Guizhou Province.The Lan Ni Gou artificial sand and stone processing system on the right bank is one of the large-scale artificial sand stone processing systems constructed domestically.This article introduces the design and construction of this system,which might provide reference for hydropower workers when they are confronted with the similar problems.
作者 陈永兵
出处 《广东水利电力职业技术学院学报》 2006年第2期45-48,共4页 Journal of Guangdong Polytechnic of Water Resources and Electric Engineering
关键词 构皮滩电站 人工砂石系统 设计 施工 Gou Pi Tan Hydropower Station artificial sand and stone processing system design construction
  • 相关文献

参考文献1

  • 1[3]长江委长江勘测规划设计研究院.乌江构皮滩水电站右岸烂泥沟砂石加工系统建设及运行管理招标文件[Z].