摘要
郭屋坝水电站经过三十多年的运行,水工建筑物不少部分已经严重损坏,大部分机电设备也已经老化,出力严重不足,效益逐年下降。为有效利用水资源、提高水资源利用效率,须对其进行多方案的资源利用比较。
After 30 years' operation,some of the hydraulic structures in Guowubai Dam hydropower Station have been seriously damaged,and the majority of electrical and mechanical equipment has been aging,which have caused a serious shortage of effort and an annual decline in effectiveness.In order to effectively use water resources and improve water use efficiency,multi-program comparison of resource utilization should be conducted.
出处
《广东水利电力职业技术学院学报》
2009年第3期27-30,共4页
Journal of Guangdong Polytechnic of Water Resources and Electric Engineering
关键词
小水电
规划
改造
淹浸
small hydropower
planning
transformation
flooding