田湾核电站软土深基坑支护设计研究 被引量:5

Research and design of shoring up the deep foundation pit in soft soil in TNPP project
下载PDF
导出
摘要 针对田湾核电站2#常规岛软土深基坑支护工程的特定条件,采用深层搅拌水泥土墙和拉锚式排桩结合形成的组合支护模式进行基坑支护,并提出了组合支护模式结构计算的简化方法,在此基础上完成了深层搅拌和拉锚式排桩系统的设计。实践证明该设计是成功的。 According to the existing conditions of the conventional island No.2 in TNPP(Tianwan Nuclear Power Plant),a combined shoring pattern of CDM(Cement Deep Mixture) retaining wall and anchored castinsitu piles was applied to shore up the deep foundation pit in soft soil. A simplified method was formulated to calculate the structure of such combined pattern. On the basis of this method, the design of CDM and anchored piles was accomplished and the design was proved to be successful.
出处 《中国水利水电科学研究院学报》 2003年第2期123-126,133,共5页 Journal of China Institute of Water Resources and Hydropower Research
关键词 软土 深基坑 支护 组合支护模式 soft soil deep foundation pit shoring combined shoring pattern
  • 相关文献

参考文献3

  • 1[1]JGJ 120-99,建筑基坑支护技术规程[S].
  • 2[2]YBJ 225-91,软土地基深层搅拌加固法技术规程[S].
  • 3GBJ10-89.混凝土结构设计规范.[S].,..