摘要
介绍了贵溪电厂420T/H锅炉汽包水位保护纳入DCS系统的改造实例,叙述了汽包水位保护方案设计和水位保护一次测量系统改进的技术措施。
Introduces the renovation of 420 T/H boiler's water level protection to be connected with DCS system in Guixi Power Plant.Describes the renovation scheme of boiler's water level protection and the technique to improve once measure system.
出处
《沈阳工程学院学报(自然科学版)》
2003年第2期17-18,共2页
Journal of Shenyang Institute of Engineering:Natural Science
关键词
锅炉
汽包
水位保护
改造
boiler
water level protection
renovation