摘要
通过分析某住宅楼桩基承载力未达到设计要求的原因 ,提出了桩基施工时注意事项。
The reason that the ultimate bearing capacity of pile does not reach the design request is analyzed.And some matter needed attention is presented,which can also guide for correlative construction.
出处
《电力勘测设计》
2001年第3期17-20,共4页
Electric Power Survey & Design
关键词
桩基工程
极限承载力
施工
Foundation work
ultimate bearing capacity
construction