摘要
某电厂二期技改工程地基处理采用桩基 ,通过综合工程试桩确定了场地内人工挖孔灌注桩和预制桩施工是可行的 ,同时为优化桩基设计参数提供了依据 ,并为桩基施工及监理积累了经验。
It has been considered to select pile foundation for ground treatment of a power plant.Based on the comprehensive pile test result.It has been indicated that artificial hole cast in piles and precast concrete piles are feasible in the site.It is provided to optimize design of piles parameters and accumulated experience for pile foundation construction and supervising.
出处
《电力勘测设计》
2001年第4期12-16,共5页
Electric Power Survey & Design
关键词
试桩
静荷载试验
动力测试
桩身应力
test pile
static load test
dynamics testing
pile stress