摘要
本文依据桩底高压灌浆技术的原理,归纳实践经验,分析桩底高压灌浆技术提高桩的承载力和桩侧摩阻力与桩端阻力的效果和规律,分析了影响灌浆效果的因素。
Introduces the principle of high-pressure grouting technology under pile and summarizes some practice experience . Analyzes the effects on improving the bearing of pile, the friction beside pile and the resistance at pile end by using this technology. Discusses the influence factors of grouting quality.
出处
《电力勘测设计》
2002年第1期45-47,共3页
Electric Power Survey & Design
关键词
桩底高压灌浆技术
效果分析
high-pressure grouting under pile
effects analysis