Construction of Shanghai Chemical Park Started
Construction of Shanghai Chemical Park Started
-
1Hao Ziguo,Fei Hongcai,Liu Lian.China Shale Gas Project Started[J].Acta Geologica Sinica(English Edition),2012,86(4):1038-1038.
-
2Design of the Largest in China Aniline Unit Started[J].China Petroleum Processing & Petrochemical Technology,2008,10(1):40-40.
-
3Largest in China Methanol Project with Coproduction of LNG Comes on Stream in Xiaoyi[J].China Petroleum Processing & Petrochemical Technology,2016,18(3):82-82.
-
4Successful Commercial Test of Novel Desulfurizing Agent at SINOPEC Shanghai Gaoqiao Branch Company[J].China Petroleum Processing & Petrochemical Technology,2016,18(4):91-91.
-
5Hao Ziguo,Fei Hongcai,Liu Lian.Chinese Shale Gas Exploration Started Officially and Primary Results Achieved[J].Acta Geologica Sinica(English Edition),2012,86(6):1594-1594. 被引量:4
-
6National petrol and natural gas trading center opens in Shanghai[J].China Oil & Gas,2016,23(4):61-61.
-
7PetroChina's LY-2005 Catalyst for Full Hydrotreating C_4/C_5 Hydrocarbons Applied at Shanghai Petrochemical Company[J].China Petroleum Processing & Petrochemical Technology,2011,13(3):68-68.
-
8West-East GasPipeline Starts Trial Operation[J].China Oil & Gas,2003,10(3):34-37.
-
9SHANGHAI INTERNATIONAL INDUSTRIAL FAIR[J].China Oil & Gas,2001,8(4).
-
10Sichuan-Shanghai gas pipeline to start up in May[J].China's Foreign Trade,2010(6):10-10.