摘要
介绍了全断面岩石掘进机的工作原理及在我国万家寨引黄工程中的应用情况 ,该机械在施工中创造了日成洞 6 5.6 0m/d和月成洞 10 83.
The paper interprets working principle of Tunnel Boring Machine (TBM) and its application in Wanjiazhai Yellow River diversion works.There the machine had a driving record of 65.60 metres per day and 1083.90 metres per month.
出处
《长春工程学院学报(自然科学版)》
2001年第1期46-47,51,共3页
Journal of Changchun Institute of Technology:Natural Sciences Edition
关键词
引黄工程
隧洞
TBM
Yellow River diversion works
tunnel
Tunnel Boring Machine