介绍了格力电器厂房的设计和施工。着重解决了预应力框架结构的延性控制 。
In this paper,the design and construction of GeLi electrical equipment factory building is introduced.The main problems solved are ductility control of prestressed frame structure,settlement of prestressed reinforcement and hole drilling during the construction.
出处
《长春工程学院学报(自然科学版)》
2001年第1期59-62,共4页
Journal of Changchun Institute of Technology:Natural Sciences Edition
关键词
预应力
钢绞线
金属波纹管
prestress
steeltendon
corrugated metal pipe