摘要
文章对已获成功的大峡岩坎爆破设计与施工中的一些问题进行反思,对爆破实践中的不足予以再认识,并提出修正或改进方法。
This paper presents a review of some issues on blasting demolition design and construction of retaining rock bar in Daxia hydropower station. Further cognition to the unsatisfactory treatment methods existing in blasting practice is made, and some methods are presented in this paper for modification and improvement.
出处
《长春工程学院学报(自然科学版)》
2001年第4期53-54,共2页
Journal of Changchun Institute of Technology:Natural Sciences Edition
关键词
水电站
岩坎爆破
设计
施工
Daxia hydropower station
retaining rock bar blasting
design
construction