摘要
以长春国际会展中心工程施工为例,介绍了全站仪在柱网布设、柱子定位及三维系统计算软件在复杂构件实测中的应用。
Taking project of Changchun International Exhibition Center for example, the paper introduces the application of electotal station in setting post net and positioning of post, and the computing software in measurement of complicated members.
出处
《长春工程学院学报(自然科学版)》
2003年第2期51-53,共3页
Journal of Changchun Institute of Technology:Natural Sciences Edition
关键词
全站仪
轴线放样
桁架安装
electotal station
measure axis
truss installa-tion