摘要
通过对新安江水电站下游尾水河道清淤模型试验的研究,提出电站下游尾水位抬高的原因,并为降低尾水位,增加发电水头提供了电站尾水渠及下游河道经济合理的清淤方案。
Based on model experiment of tailrace dredging of Xin'anjiang hydropower station, the paper illustrates the reasons for the raising of tailrace. In order to reduce tail head and increase the efficiency of generating power, an economical theoretic scheme of tailrace dredging is proposed.
出处
《长春工程学院学报(自然科学版)》
2004年第4期16-18,48,共4页
Journal of Changchun Institute of Technology:Natural Sciences Edition
基金
大连理工大学横项课题(项目编号:DUT-HY-01)
关键词
新安江水电站
河道清淤
尾水
Xin'anjiang hydropower station
tailrace dredging
tail water