半导体生产线调度与仿真系统研究与实现 被引量:3

The Research and Implementation of a Scheduling and Simulation System for Semiconductor Production Line
下载PDF
导出
摘要 基于半导体制造企业的实际需求,在SIMUL8平台上设计并实现了半导体生产线调度与仿真系统TB-PSS。该系统主要由三个子系统构成:数据库子系统、仿真调度子系统和性能分析评价子系统。仿真调度子系统是TB-PSS系统的核心,它根据数据库提供的数据和调度规则从生产线当前状态开始仿真,仿真结果预测了生产线即将发生的事件,由性能分析评价子系统反馈给用户。目前,TB-PSS已在半导体生产线上得到了应用,能够辅助生产管理人员决策,并取得了较好的实际效果。 According to the practical demands from the semiconductor production lines, a scheduling and simulation system for semiconductor product line, TB-PSS, is designed and implemented on the platform of SIMUL8. TB-PSS is composed of three sub-systems: the database sub-system, the simulation and scheduling sub-system and the analysis of performance sub-system. The simulation and scheduling sub-system is the most important part of TB-PSS, which uses input data provided by database and policy rules to simulate from the current state of product line in time. The result is a plan that predicts what will happen in the real production line, showed to user by the analysis of performance sub-system. Now, TB-PSS has been applied in a semiconductor product line to assist the manufacture manager in making decision, and has gotten a well feedback.
出处 《系统仿真技术》 2005年第3期168-172,共5页 System Simulation Technology
基金 国家自然科学基金项目(60374005) 国家973项目(2002CB312202) 上海市博士后基金项目(04QMX1429)资助
关键词 半导体生产线 SIMUL8 离散事件系统仿真 仿真优化 semiconductor production line SIMUL8 discrete event simulation optimization of simulation
  • 相关文献

参考文献4

  • 1[1]Subhash C S,Sammer T S.Reduction of average cycle time at a wafer fabrication facility[R].Blackburg VA:Virginia Tech,2001.
  • 2[2]Balci O,et al.The visual simulation environment[A].In:Proc.The 11th European Simul.Multiconf.[C],Istanbul,Turkey,June,1997.
  • 3[3]Banks J,Gibson R.Simulation modeling:some programing required[J].IIE Solutions,1997(2):26-31.
  • 4[4]黄洪.一种新的离散事件仿真时间递进机制--混合时间递进机制[D].杭州:浙江工业大学,1994.

同被引文献6

  • 1王丹,张浩.离散制造业APS生产数据结构的研究及应用[J].机电一体化,2007,13(2):25-28. 被引量:5
  • 2Shalliker J, Ricketts C. An Introduction to SIMUL8 [R]. University of Plymouth, 2002:37.
  • 3黄洪.一种新的离散事件仿真时间递进机制-混合时间递进机制[D].杭州:浙江工业大学,1994:57-58.
  • 4Hans Otto Genther,Paul van Beek.Advanced Planning and Scheduling Solutions in Process Industry[M].ISBN:3540002227,Publisher:Springer,2003:2-3.
  • 5HANS O G, PAUL V B. Advanced Planning and Scheduling Solutions in Process Industry [M]. ISBN: 3540002227, Publisher: Springer, 2003.8: 2-3.
  • 6朱华锋,谭建荣,李伯鸣,李涛.制造数据管理系统的总体设计及其功能实现[J].计算机工程,2000,26(10):23-25. 被引量:8

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部