满堂支架在混凝土现浇连续梁施工中的方案设计与应用 被引量:28

SCHEME DESIGN AND APPLICATION OF FULL SPACE SUPPORTS FOR CONSTRUCTION INSITU OF PRESTRESSED CONCRETE CONTINUOUS BOX BEAMS
下载PDF
导出
摘要 满堂支架支承体系属多支点承体系 ,以多支点分散荷载 ,将荷载传向地基 ,因此要求地基必须具有足够的承载力 ,能将现浇混凝土施工过程中支架下沉量控制在允许范围内 ,同时要求所有支点均匀下沉 ,以预防梁体由于不均匀下沉而产生开裂。本文就满堂支架设计与施工应用等方面进行了技术分析和总结。 The bearing system of full space supports is a multi -fulcrum bearing system. The loads are scattered through multi-points and tran smitted to the foundation. There fore, it is required that the foundation should have sufficient bearing capacity, so as to render the settlement amount of the supports controlled within allowable scopes during the construction procedure of casting concrete in situ. At the same time, even settlement is required for all fucrum points to prevent cracks produced on beam's body due to uneven settlemen ts. The technical analyses and sunnaries concerned with the design, construction and applications of the full space supports are put forward in this paper.
出处 《铁道工程学报》 EI 2001年第3期64-68,共5页 Journal of Railway Engineering Society
关键词 满堂支架 连续箱梁 现浇 方案设计 应用 full space supports continuous box beam casting concrete in situ scheme design application
  • 相关文献

参考文献1

  • 1[1]老川藏路跨线桥上部结构变更图[Z].

同被引文献87

引证文献28

二级引证文献70

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部