具有材料搬运装置的机器排序问题综述 被引量:1

A Review of Scheduling Problems of Machines with Material Handling Device
下载PDF
导出
摘要 排序是把有限资源分配给一些任务以优化某个目标函数。对排序问题的最新研究主要集中在扩展模型到更实际的约束上。对排序问题的研究在实际应用中的新发展 ,特别是具有材料搬运装置的机器排序问题和抓钩排序问题作了综述。 Scheduling is conserned with allocating limited resources to tasks to optimize certain objective functions. The recent developments in scheduling theory have focused on extending the models to include more practical constraints. In this paper we review the new development of scheduling in practice, espacially the machine scheduling with material handling device(the robotic cell scheduling problem, the automated guided vehicles scheduling problem etc.) and the hoist scheduling problem.
出处 《中国机械工程》 EI CAS CSCD 北大核心 2001年第z1期165-168,12,共5页 China Mechanical Engineering
基金 国家自然科学基金资助项目 ( 5 9990 470 -4 )
关键词 排序问题 材料搬运装置 scheduling problem material handling device
  • 相关文献

参考文献40

  • 1[1]Blazewicz J,Ecker K, Pesch E et al.Scheduling computer and manufacturing processes. Springer, Berlin/New York,1996.
  • 2[2]Baker K R.Element of Sequencing and Scheduling.Amos Tuck School, Dartmouth College, Hanover NH, 1995
  • 3[3]Brucker P. Scheduling Algorithms, Springer. New York, 1995.
  • 4[4]Pinedo M L.Scheduling:theory,Algorithms,and Systems.Prentice-Hall, Englewood Cliffs, NJ,1995.
  • 5[5]Daniels R L,Mazzola J B. Flow Shop Scheduling with Resource Flexiblility.Operations Research,1994,42:504~522
  • 6[6]Daniels R L,Hoopes B J,Mazzola J B.Scheduling Parallel Manufacturing Cells with Resource Flexibility.Management Science, 1996,42:1260~1276
  • 7[7]Daniels R L,Hoopes B J,Mazzola J B.An Analysis of Heuristics for the Parallel Machine Flexible-Resource Scheduling Problem.Annals of Operations Research, 1997,70:42~50
  • 8[8]Alidaee B,Ahmadian A.Scheduling on a Single Processor with Variable Speed.Information Processing letters, 1996, 60:189~193
  • 9[9]Trick M A.Scheduling Multiple Variable-Speed Machines.Operations Research,1994,42:234~248
  • 10[10]Nicholas G,Hall N G, Posner M et al.Scheduling with Finite Capacity Input Buffers.Operations Research,1998,46:(3)S153~S159

同被引文献70

  • 1SUN T C, LAI K K, LAM K, et al. A study of heuristics for bidirectional multi-hoist production scheduling systems[J].International Journal of Production Economics, 1994,33 (1/2/3) :207-214.
  • 2AGNETIS A. Scheduling no-wait robotic cells with two and three machines[J]. European Journal of Operational Research, 2000,123 (2): 303-314.
  • 3AGNETIS A, PACCIARELLI D. Part sequencing in three-machine no-wait robotic cells[J].Operations Research Letters,2000,27(4) : 185-192.
  • 4KARZANOV A V, LIVSHITS E M. Minimal quantity of operators for serving a homogeneous linear technological process[J]. Automation and Remote Control, 1978,39 (3) : 162-169.
  • 5KATS V, LEVNER E. Minimizing the number of robots to meet a given cyclic schedule[J].Annals of Operations Research, 1997,69 (0) : 209-226.
  • 6LEUNG J M Y, LEVNER E. An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times[J]. Operations Research Letters, 2006,34 (4) : 465-472.
  • 7CHE Ada, CHU Chengbin, LEVNER E. A polynomial algorithm for 2-degree cyclic robot scheduling[J].European Journal of Operational Research, 2003,145 (1) : 31-44.
  • 8CHU Chengbin. A faster polynomial algorithm for 2-cyclic robotic scheduling[J].Journal of Scheduling, 2006, 9 (5) : 453-468.
  • 9KATS V, LEVNER E, MEYZIN L. Multiple-part cyclic hoist scheduling using a sieve method[J]. IEEE Transactions-on Robotics and Automation, 1999,15 (4): 704-713.
  • 10CHE Ada, CHU Chengbin, CHU Feng. Multicyclic hoist scheduling with constant processing times[J]. IEEE Transactions on Robotics and Automation, 2002,18(1) : 69-80.

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部