摘要 从实际应用的角度,分析了晶圆加工生产线排程特点,建立了晶圆加工生产线排程数学模型(LSM-WFL),给出了以瓶颈设备为核心、蚁群优化算法为主要工具的晶圆加工生产线排程方法(LSA-WFL)。基于实际生产线模型仿真验证的结果表明,LSA-WFL能够在允许的时间内获得晶圆加工生产线排程方案。 A sequencing model for wafer fabs was designed based on their sequencing characteristics.A four-layer ant colony optimization-based sequencing method was then developed.The method is fast and provides global optimization.Simulations based on an actual wafer fab show that the method could calculate the sequencing plan within a the reasonable time.
出处 《清华大学学报(自然科学版)》 EI CAS CSCD 北大核心 2007年第z2期1890-1894,共5页 Journal of Tsinghua University(Science and Technology)
基金 国家自然科学基金资助项目(70531020 60374005) 国家"九七三"重大基础研究基金项目(2002CB312002)
关键词 晶圆加工生产线 排程 蚁群优化 瓶颈 wafer fabrication lines sequencing ant colony optimization(ACO) bottleneck
  • 相关文献

参考文献3

  • 1[2]Jin Young Choi,Reveliotis S A.A generalized stochastic petri net model for performance analysis and control of capacitated reentrant lines[J].IEEE Transactions on Robotics and Automation,2003,19(3):474-480.
  • 2[3]Mason S J,Oey K.Scheduling complex job shops using disjunctive graphs:A cycle elimination procedure[J].International Journal of Production Research,2003,41 (5):981-994.
  • 3[5]Dabbas R M.A new scheduling approach using combined dispatching criteria in semiconductor manufacturing systems[D].Tempe AZ:Arizona State University,1999.

同被引文献42

  • 1王遵彤,乔非,吴启迪.复合优先级控制策略研究及其在半导体生产线调度中的应用[J].中国机械工程,2005,16(22):2005-2009. 被引量:2
  • 2Zuo Yan Gu Hanyu Xi Yugeng.Modified bottleneck-based heuristic for large-scale job-shop scheduling problems with a single bottleneck[J].Journal of Systems Engineering and Electronics,2007,18(3):556-565. 被引量:20
  • 3Shi N C,Meerkova S M,Zhang L.Assembly Systems with Non-exponential Machines:Throughput and Bottlenecks[J].Nonlinear Analysis:Theory,Methods & Applications,2008,69(31):911-917.
  • 4Roser C,Nakano M,Tanak M.Comparison of Bottleneck Detection Methods for AGV Systems[C]//Proceedings of the 2003 Winter Simulation Conference,New Orleans.2003:1192-1198.
  • 5Rajakumar S,Arunachalam,Selladuraiv.Workflow Balancing in Parallel Machine Scheduling with Precedence Constraints Using Genetic Algorithm[J].Journal of Manufacturing Technology Management,2006,17 (2):239-254.
  • 6Zhang R,Wu C.Bottleneck Machine Identification Method Based on Constraint Transformation for Job Shop Scheduling with Genetic Algorithms[J].Information Sciences,2012,188:236-252.
  • 7Richard A R.Applying the TOC Five-step Focusing Process in the Service Sector-A Banking Subsystem[J].Managing Service Quality,2007,17 (2):209-234.
  • 8Wang Z J,Chen J,Wu Q D.A New Method of Dynamic Bottleneck Detection for Semiconductor Manufacturing Line[C]//Proceedings of the 17th World Congress the International Federation of Automatic Control,Amsterdam.2008:14840-14845.
  • 9Yoon S H,Ventura J A.An Application of Genetic Algorithms to Lot-streaming Flow Shop Scheduling[J].IIE Transactions,2002,34 (9):779-787.
  • 10Nahas N,Ait-kadi D,Nourelfath M.A New Approach for Buffer Allocation in Unreliable Production Lines[J].International Journal of Production Economics,2006,103(2):873-881.

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部