摘要
P3软件是针对项目管理而开发的世界顶级软件 ,主要用于项目进度计划、动态控制、资源管理和成本控制。通过P3软件在 5 0 0kV天广Ⅲ回输变电工程应用 ,体会到推广应用P3软件需要领导重视和支持 ,需要使用者有一定的理解能力和实践经验 ,要明确运用P3软件应达到的目的 ,制定相应的管理制度 ,建立所有参建单位都使用P3软件的外部环境。在使用中注意计划编制不宜太细 ,资源设置不宜太多 ,管理层次要清晰 ,要注意P3软件的二次开发。总之 ,为以后应用P3软件探索出一套现代化的项目管理思路。
The P3 software is a top software in the world developed for project management and mainly used for planning of project schedule, dynamic control, resources management and cost control. Through application of the software in 500 kV Tian-Guang III circuits transmission and distribution project the author understands that application and popularization of the P3 software require attention and assistance from leaders, the user having understanding and practical experiences to a certain extent. The purpose to be reached for its application should be clear with stipulation of corresponding management system. The external environment that all organs participating in construction should use the software must be set up. The plan drawn out would better not be too much in detail, the management levels should be clear enough and attention should be paid on the secondary development. In general speaking, a train of thought for management of modernized project will be sought out for future application of P3 software.
出处
《电力建设》
北大核心
2002年第8期38-40,67,共4页
Electric Power Construction
关键词
P3软件
项目管理
天广Ⅲ回输变电工程
P3 software
project management
Tian-Guang III circuits transmission and distribution project