期刊文献+

大同市区地下水开采与地裂缝形成的关系 被引量:6

Relation between Ground Fissure Formation and Ground Water Mining in Urban Datong
下载PDF
导出
摘要 大同市地下水开采的有关资料表明,自1981年以来大同市地下水开始超采,致使大同市地下水各降落漏斗已逐渐靠拢或合并,已经形成了一占据大同大半市区的降落漏斗。通过对大同市各地下水取水点超采量的变化、地面沉降的发生时间与相应位置、地裂缝产生的规律、地质构造的区域背景资料的详细对比与分析,说明了地下水严重超采是导致大同市地面沉降与地裂缝产生的直接诱因。 Related data of ground water mining in urban Datong demonstrated that extraordinary mining of ground water since 1981,made the various drawdown cones gradually closed together and even merged and formed a large drawdown cone with an area of more than half of urban Datong.After detailed contrasting and analyzing each ground water well extraordinary min-ing changes,surface subsidence happening time and relevant location,ground fissure formation orderliness,regional geo-logical structure setting,explained the direct inducement of surface subsidence and ground fissure formation is severe extraor-dinary mining of ground water.
作者 昝雅玲
机构地区 山西省煤炭地质
出处 《中国煤炭地质》 2006年第6期26-29,37,共5页 Coal Geology of China
关键词 地面沉降与地裂缝 地下水超采 关系 诱因 大同市 surface subsidence and ground fissure[ extraordinary mining of ground water[ relation[ inducement[ Datong City
  • 相关文献

参考文献2

  • 1[1]西安地质学院.大同市地质勘察研究[R].陕西西安:西安地质学院,1995.
  • 2[2]昝雅玲.大同城区及经济技术开发区地质灾害区划报告[R].山西大同:山西省煤炭地质115勘查院,2006.

同被引文献99

引证文献6

二级引证文献55

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部