期刊文献+

首钢二炼2#转炉基础对穿预应力锚索加固

Reinforcement with cross prestressed anchor cable for the foundation of 2# converter in secondary steel works of the Capital Iron and Steel Company
下载PDF
导出
摘要 文章以首钢二炼 2 #转炉基础对穿预应力锚索施工实例 ,介绍了在复杂转炉基础加固中对穿锚索水平钻孔的钻进工艺。 Taking the practical example as what said in the title the paper introduces the technological process for drilling method of horizontal drilling hole, prestressed anchor cable reinforcing method and crack pressure grouting in reinforcement for foundation of complex converter.
出处 《中国地质灾害与防治学报》 CSCD 2001年第3期13-15,共1页 The Chinese Journal of Geological Hazard and Control
关键词 转炉基础 预应力锚索 压力灌浆 首钢 the converter foundation prestressed anchor cable pressure grouting Capital Iron and Steel Company
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部