摘要
后张法预应力施工工艺是桥梁预应力构件制作的常用方法,张拉是其施工工艺重要工序之一。在施工中由于本工序失误,造成预应力结构物不合格,返工率较高,经济损失较大。本文介绍预应力混凝土张拉质量情况、影响质量的原因及要因,提出了对策、目标和具体措施,提高后张法预应力混凝土张拉工序一次验收合格率,不但提高工程质量,也提高了经济效益和社会效益。
The post-tensioning procedure is the commonly used method which the bridge pre-stressed component manufactures.Tensioning force is one of the important working procedures of construction craft.In the construction because of this working procedure fault,it causes the pre-forced structure not to be unqualified.It needs to do again,and the economic loss is large.This article introduces the quality instance of pre-forced concrete and the influencing quality reason to put forward the countermeasure,the goal and ...
出处
《白城师范学院学报》
2008年第3期48-53,共6页
Journal of Baicheng Normal University
关键词
预应力混凝土
后张法
张拉工序
验收
合格率
pre-forced concrete
post-tensioning method
tensioning procedure
acceptance
qualified rate