本文对改良焊接管母导轨、改进管母的吊装方法采用同步到位,降低劳动强度,提高劳动效率进行了讨论,可供遇有相同或类似的施工进行参考。
The questions that how to improve the jointing tube bus slideway,how to ameliorate the lift method of tube busadopting synchro location-fitting in order to reduce labour intension and raise labour efficiency have been discussecl in this paper.Itwould be a reference in the same or similar construction.
出处
《广东输电与变电技术》
2005年第1期38-41,共4页
Guangdong Power Transmission Technology
关键词
管母线吊装
施工方法改进
The lift-setting of tube bus
Improving the constructing method