摘要
高坝洲水电站经过改造后的电气主接线大大提高了电站经济效益、系统稳定性、操作灵活性。
Through the reform of the main electrical connection,the economical effect,operating stability and flexibility of Gaobazhou hydropower station are notably improved.
出处
《湖北水力发电》
2005年第4期51-53,共3页
Hubei Water Power
关键词
电气
主接线
高坝洲电站
main electrical connection,Gaobazhou hydropower station