摘要
实地调查了中国 5省 (市 ) 8座抽水蓄能电站 ,并对它们的实际运行资料进行分析计算 ,论述了中国抽水蓄能电站的建设运营现状、存在的问题及其原因 ,指出了湖北电网兴建抽水蓄能电站应注意的有关问题。
Based on the investigation of eight pumped storage power stations (PSPS) in five provinces (or municipality), and the analysis about their operation situation at present, some matters needing attention for building PSPS in Hubei power network are pointed out.
出处
《湖北水力发电》
2004年第2期16-19,65,共5页
Hubei Water Power
关键词
抽水蓄能电站
效益
投融资
建设经营模式
电价
信贷与财税
pumped storage power station (PSPS), effectiveness, financial investment, building and operating mode, electricity rate, credit and taxes