摘要
针对某高层建筑施工过程中基坑四壁渗水引起周围地面下沉并产生轻微裂缝的情况。采取灌浆和砖砌挡水墙等综合治理方案,取得了较好的效果。
During construction process of a high rise building seepages from foundation pit walls were discovered which caused settlement of ground around and cracking.Grouting and brick re-taining walls were used as a combined solution to the situation,producing good results.
出处
《中国建筑防水》
2010年第12期27-29,共3页
China Building Waterproofing
关键词
基坑渗水
地面裂缝
注浆
砖砌挡水墙
foundation pit seepage
ground cracking
grouting
brick retaining wall