沈阳奥林匹克中心体育场屋面系统工程施工技术

Construction Technology of Shenyang Olympic Center Stadium Roof Systems
下载PDF
导出
摘要 沈阳奥林匹克体育中心体育场屋面系统主要包括如下几个系统:直立锁边金属屋面系统,面积约39 244.34 m2;中空阳光板屋面系统,面积约19 140.32 m2;南北看台平行弦桁架上半部拉索点式玻璃屋面系统,面积约5 541.6 m2;4个主拱墩上部钢结构点式玻璃屋面系统,面积约2 451.2 m2。合计共约66 377.46 m2。 Shenyang olympic sports center stadium roofing,includs the following system:vertical side-lock metal roofing system,an area of about 39244.34 m2;hollow sun roof panel system,an area of about 19140.32 m2;north and south stands the upper half of the parallel chord truss glass houses face Lasso point system,with an area of approximately 5541.6 m2;the upper part of the four main arch pier steel glass houses face point system,with an area of approximately 2451.2 m2.combined total of about 66377.46 m2.
出处 《江苏建筑》 2009年第6期48-50,共3页 Jiangsu Construction
关键词 直立锁边咬合式(Standing SEAM System)点支撑金属屋面 中空阳光板屋面 拉索点式玻璃屋面 施工技术 occlusal vertical edge-type lock(Standing Seam System) points to support the metal roof hollow sun roof panels glass houses face Lasso point construction technology
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部