应用RBI技术对延迟焦化装置进行风险评估

USING RBI TECHNOLOGY TO PERFORM RISK ASSESSMENT OF THE DELAYED COKING UNIT
下载PDF
导出
摘要 应用RBI技术对某石化公司延迟焦化装置进行了风险评估。根据评估结果,对该装置静设备和管道进行了风险排序识别出主要损伤机理,对风险排序靠前的设备(重点对分馏塔的腐蚀和焦炭塔的寿命)和管道提出了降低风险的措施和设备管理建议。 This article applies RBI technology to perform risk assessment of the delayed coking unit of some Petrochemical Enterprise.Main damage mechanism is distinguished by risk sequence based on the result of risk assessment of static equipment and the pipeline in this unit,and risk reduction measures and equipment management suggestion are made on the equipment and pipe with risk precedence,(distillation corrosion and coking drum life is in focus).
出处 《石油化工设备技术》 CAS 2009年第6期34-37,6,共5页 Petrochemical Equipment Technology
关键词 RBI 风险评估 延迟焦化 Risk-Based Inspection(RBI) Risk assessment delayed coking unit
  • 相关文献

参考文献1

二级参考文献9

  • 1合肥通用机械研究所压力容器检验站.BV,茂名石化加氢裂化装置风险评估报告[R].,2003.12..
  • 2戴树和.新兴学科<风险工程学>梗概[A]..第五届全国压力容器学术会议专题报告[C].,2001,9.1-8.
  • 3.合肥通用机械研究所压力容器检验站,BV,茂名石化乙烯公司乙烯裂解装置风险评估报告[R].,2003.12..
  • 4American Petroleum Institute:Risk-based Inspection Base Resource Document[S].API 581,First Edition,2000.5.
  • 5American Petroleum Institute:Risk based Inspection[S].API 580,First Edition,2002.5.
  • 6J.T.Reynolds.The Application of Risk-Based Inspection Methodology in the Petroleum and Petrochemical Industry[J].ASME PVP,1996,Vol(336):125-134.
  • 7T.L.Willke.U.S.Risk Management Can Reduce Regulation,Enhance Safety[J].Oil & Gas Journal,1997,95(24): 37-46.
  • 8张平生.油气输送管道的风险管理与基于风险的检测[J].油气储运,1999,18(2):13-18. 被引量:7
  • 9杨铁成,陈学东,魏安安,王冰,胡久韶,陈谊民,杨琪新.基于半定量风险分析的加氢装置安全评估[J].压力容器,2002,19(12):43-45. 被引量:16

共引文献105

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部