摘要
针对3150 t挤压机组生产中穿孔机工具配置不合理的问题,提出了优化整合实施的措施,在进一步挖掘内部降本潜力,降低生产成本收明显的效果。
Aiming at the unreasonable tools configuration of the piercing mill in the producing operation of 3150 ton extrusion unit,some measures of optimal integration were proposed in this paper,so the achievement of lowering producing cost could be obtained.
出处
《特钢技术》
CAS
2009年第3期42-44,66,共4页
Special Steel Technology
关键词
配置
优化整合
成本
工模具钢
穿孔针
扩孔帽
镦粗帽
Configuration
Optimization integration
Cost
Tool and die steel
Piercing needle
Expanding cap
Upsetting cap