喜河水电站进水口上游围堰高程对排沙及冲渣影响的试验研究 被引量:2

Experimental Study on the Effects of Upstream Cofferdam Removal Elevation on Scouring and Discharge of the Xihe Hydropower Station
下载PDF
导出
摘要 通过水工模型试验研究喜河电站厂房坝段不同围堰拆除高程对坝区水流流态、排沙及冲渣的影响,及在现有水工结构下,通过运行闸门泄洪方式能否做到机组进水口"门前清",论证现状残留围堰的合理性,为喜河水电站提出合理的围堰拆除高程,也为其他类似电站围堰高程提供可借鉴的资料。 The effects of the upstream cofferdam with different removal elevation on flow regime,sediment discharge,flushing residue for the Xihe Hydropower Station was studied in hydraulic model experiments.The results demonstrate that the discharge gate may operate rationally to realize the inlet of generating units without sediments in the existed conditions of hydraulic structure,and cofferdam removal elevation is reasonable,which may provide reference for other similar hydropower stations.
机构地区 西安理工大学
出处 《电网与清洁能源》 2010年第5期79-82,共4页 Power System and Clean Energy
关键词 围堰拆除高程 排沙 冲刷量 cofferdam removal elevation sediment discharge scouring amount
  • 相关文献

参考文献5

二级参考文献44

  • 1曹文洪,张启舜.潮流和波浪作用下悬移质挟沙能力的研究[J].泥沙研究,2000,25(5):16-21. 被引量:28
  • 2郭庆超.天然河道水流挟沙能力研究[J].泥沙研究,2006,31(5):45-51. 被引量:29
  • 3张仁.长江三峡工程的泥沙问题[J].中国三峡建设,2007(1):5-9. 被引量:4
  • 4倪晋仁 王光谦.论悬移质浓度垂线分布的两种类型及其产生的原因[J].水利学报,1987,(7).
  • 5尹学良.弯曲性河流形成原因及造床试验初步研究[J].地理学报,1965,31(4):287-303.
  • 6张启舜.明渠水流泥沙扩散过程的研究及其应用[J].泥沙研究,1980,.
  • 7韩其为.水库淤积与河床演变的(一维)数学模型[J].泥沙研究,1987,3.
  • 8许炯心.水库下游河道复杂响应的试验研究[J].泥沙研究,1986,(4).
  • 9李义天.冲积河道平面变形计算初步研究[J].泥沙研究,1988,(3).
  • 10林秉南.我的认识[M].见:三峡工程泥沙问题研究,1996~2000,第八卷.北京:知识产权出版社,2002.

共引文献16

同被引文献10

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部