摘要
日本三菱350 MWe机组小机高压汽源在运行中长期处于备用状态,而高压疏水因高压汽源管路备用而长期流通造成工质的浪费。为了节省工质切断高压汽源,改造后系统稳定,消除了浪费,供同行借鉴参考。
In the 350MWe unit manufactured by Mitsubishi,the high pressure steam source of the small turbine was in standby status during the long term operation,thus the working medium was wasted due to the producing of high pressure drainage.In order to save the working medium,the high pressure steam source was cut off completely.After the reformation,the system operates stably,and the working medium waste was eliminated.The experience was presented in this paper for reference.
出处
《电力技术》
2010年第9期22-25,共4页
Electric Power Standarization & Construction Cost Control Information
关键词
小机
高压汽源
切除
节能
small turbine
high pressure steam source
cut off
energy conservation