期刊文献+

乌江渡水库洪水调度在构皮滩水电站施工导流中的作用 被引量:1

Role of Flood Dispatching Conducted in Wujiangdu Hydropower Station in Construction Diversion Scheme of Goupitan Hydropower Station
下载PDF
导出
摘要 构皮滩水电站坝址河谷狭窄、洪水峰高量大,施工导流方案的设计是一大难题,为此对上游乌江渡水库进行了水库洪水调度研究,认为构皮滩水电站在施工期间利用乌江渡水库配合调蓄洪水,可减小导流洞规模,对缩短建设工期和减小导流洞工程投资具有重要作用,并提出了乌江渡水库"等蓄量法"的基本洪水调度方式。通过水库洪水调节计算、河道洪流演进计算及综合经济技术比较,推荐构皮滩水电站采用3条断面尺寸为15 6m×17 7m导流洞、乌江渡水库预留5 5亿m3防洪库容配合运用的施工导流方案。 The design for diversion scheme of Goupitan Hydropower Station is very difficult,because the valley in the dam site is narrow as well as peak flood is high and big.Through researching on flood dispatching of Wujiangdu Reservoir located at its upstream,it is considered that the scale of diversion tunnels of Goupitan Hydropower Station could be reduced if Wujiangdu Reservoir could dispatches and stores flood during the construction period.The paper raises a basic flood dispatch method 'equal storage method'for Wujiangdu Reservoir.Through calculating and comparison this diversion scheme is recommended that Guopitain Hydropower Station adopts three tunnels with section of 156m×177m as well as Wujiangdu Reservoir reserves capacity of 550×106 m3.
出处 《贵州水力发电》 2003年第2期10-12,共3页 Guizhou Water Power
关键词 水利管理 乌江渡水库洪水调度 构皮滩水电站施工导流 conservancy management,flood dispatch of Wujiangdu Reservoir,construction diversion of Guopitan Hydropower Station
  • 相关文献

同被引文献7

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部