本文通过岩土工程勘察实例,分析论述了岩土工程勘察所需采取的原位测试手段,及利用原位测试数据和土工试验指标进行岩土工程评价的方法。
Using practice examples, this paper analyses and states in- situ test method needed in geotechnical engineering investigation. The methods of using in - situ test data and test target to evaluate the geotechnical engineering are mentioned in this paper.