摘要
本文作者通过本人多年的工程实践、施工中所掌握的关键环节 。
According to his many years' construction experie nce and grasped key point in construction, the author states how to control the con struction quality of artificially filling pedestal pile in detail.
出处
《林业科技情报》
2003年第3期26-28,共2页
Forestry Science and Technology Information
关键词
桩位偏差
泥浆
钻孔
钢筋笼
pile offsetting
slurry
hole drilling
reinforcing s teel bar