摘要
我省水文站点多面广,且多数位于偏僻山区,基础设施项目较为分散,单个项目的投资额较小、 管理难度较大。笔者通过对工作实践和总结分析,提出较为有效的投资控制办法。
There are many hydrology stations in GD, most of which are scattered sparsely and located in remote mountainous areas. This will result in dispersed infrastructure projects. The investment of a single project is small and hard to manage. Drawing on her experience and understanding, the author puts forward an effective approach to controlling the projects' costs.
出处
《广东水利电力职业技术学院学报》
2003年第3期53-54,共2页
Journal of Guangdong Polytechnic of Water Resources and Electric Engineering