潮州供水枢纽围堰拆除方案选择要点浅析

Analysis of Main Points of Selecting Cofferdam Removal Scheme for Chaozhou Water Supply Junction Project
下载PDF
导出
摘要 文章结合潮州供水枢纽西溪围堰的拆除时间、坝址地质条件等特点,提出要辩证地分析围堰高 程、防洪能力、围堰稳定、施工强度四者之间的关系,同时对拆除围堰关键要素进行分析并提出一些见 解。 In light of such factors as time of removal, geological conditions of dam site in Xixi Cofferdam Removal Works under Chaozhou Water Supply Pivot Project, the paper proposes that the relationship between cofferdam height, flood control capacity, cofferdam stabilization and construction intensity be analyzed dialectically. In addition, key factors of cofferdam removal should be analyzed and understood further.
作者 曾陈平
出处 《广东水利电力职业技术学院学报》 2003年第3期55-56,61,共3页 Journal of Guangdong Polytechnic of Water Resources and Electric Engineering
关键词 围堰拆除 方案选择 要点浅析 cofferdam removal scheme selection analysis of key factors