摘要
文章结合潮州供水枢纽西溪围堰的拆除时间、坝址地质条件等特点,提出要辩证地分析围堰高 程、防洪能力、围堰稳定、施工强度四者之间的关系,同时对拆除围堰关键要素进行分析并提出一些见 解。
In light of such factors as time of removal, geological conditions of dam site in Xixi Cofferdam Removal Works under Chaozhou Water Supply Pivot Project, the paper proposes that the relationship between cofferdam height, flood control capacity, cofferdam stabilization and construction intensity be analyzed dialectically. In addition, key factors of cofferdam removal should be analyzed and understood further.
出处
《广东水利电力职业技术学院学报》
2003年第3期55-56,61,共3页
Journal of Guangdong Polytechnic of Water Resources and Electric Engineering
关键词
围堰拆除
方案选择
要点浅析
cofferdam removal
scheme selection
analysis of key factors