摘要
深圳某工程应用钢塑复合拉筋带加筋土构筑挡土墙 ,形成溢流直立坡 ,单级直立高度 18m ,较原块石混凝土溢流坝方案节约投资 70 % ,同时又获得了形成单级高瀑布的景观要求。介绍了钢塑复合拉筋带加筋土挡土墙的设计及施工工艺流程 ,并以工程实例比较了其经济性。
The retaining wall is 18 m high and is composed of vertical slab, footing block and overflow cap. The vertical slab is anchored with the soil mass behind the wall by steel-plastics reinforcement, and thus the engineering cost of the retaining wall is saved about 70% than the rubble concrete gravity wall. The design and construction program are described, and an engineering example is given to show its economic effectiveness.
出处
《湖北水力发电》
2003年第1期32-34,共3页
Hubei Water Power
关键词
加筋土挡土墙
设计和计算
施工工艺
经济效益
retaining wall anchored by steel-plastics reinforcement, design and calculation, construction technology, economic effectiveness