摘要
丹江口水电厂有6台机组,单机容量15万kW,自1968年10月首台机组发电至今已有30多年,机组的主要设备都已更新,增设了计算机监控系统,但原来的技术供水系统设备已不能适应实现自动控制的要求,系统设备改造势在必行。介绍自动滤水器及减压阀在丹江口水电厂的应用效果。
Danjiangkou hydropower plant has six power units, each of them has capacity 150 MW. The Power plant has been operated more than 30 years since the first unit was put to operation in October 1968, now, the main parts of the units have been reformed and computer monitoring system has been set up, however, the outmoded technical water supply system couldn t fit the requirement of automatic control yet, and must be remade as soon as possible. The effect of new automatic filter and pressure relief valve are introduced.
出处
《湖北水力发电》
2003年第4期14-15,共2页
Hubei Water Power
关键词
丹江口水电厂
技术供水
过滤器
减压阀
Danjiangkou hydropower plant, technical water supply, filter, pressure relief valve