摘要
国内外有关的统计资料显示出,在项目实施阶段实现造价控制的必要性。在介绍隔河岩造价控制经验的基础上,提出工程造价事前控制的费用预测分析方法。
The statistical data both in China and abroad show that it is necessary to control the construction cost of hydropower project during its whole implementing course. Based on the experience of cost control of Geheyan hydropower project, an analysis method of cost estimation to precontrol the construction cost is presented.
出处
《湖北水力发电》
2003年第4期34-36,共3页
Hubei Water Power
关键词
工程造价
预测控制
静态切块
动态管理
construction cost, precontrol of cost, static sectionalizing, dynamic control