摘要 以准能矸电二期工程为例分析了300MW CFB机组采用滚筒冷渣器的冷却水系统,认为对不设置闭式循环冷却水系统的机组,以凝结水作为冷渣器的冷却水在节能和降低工程造价方面均有优势;并对以凝结水为冷渣器冷却水的系统进行了设计优化。 This paper takes Huaineng Coal Mine Waste second phase power project as an example to analyze the cooling water system of roller type ash cooler for 300Mwe CFB.It is considered that for a CFB unit without closed circulation cooling water system,to use condensate as cooling water for roller type ash cooler has the advantages for both energy saving and reducing construction cost.Optimization design of cooling water system using condensate as cooling water is also discussed.
出处 《电力技术》 2010年第2期49-51,共3页 Electric Power Standarization & Construction Cost Control Information
关键词 300MW CFB机组 冷渣器冷却水系统 设计优化 300Mwe CFB unit Cooling water system for ash cooler Optimization design
  • 相关文献

同被引文献34

引证文献4

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部