摘要
在分析三峡左岸厂房混凝土缺陷的基础上,介绍了针对各类不同缺陷,采用不同的修补方法,取得了较好工程效果的情况,以及修补材料及其配合比。
Aiming at various concrete deferts, different repair measures are adopted and good results achieved. The practice shows that these measures are useful for the construction of massive concrete works.
出处
《湖北水力发电》
2002年第2期37-39,共3页
Hubei Water Power
关键词
三峡工程
混凝土
缺陷
修补处理
Three-Gorge Project, concrete, defect, repairing treatment